Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)2300-3183/Kwpeak | 2300–3183£(2010)/KWpeak |
Operating cost | £(2010)116-186/Kwpeak | 116–186£(2010)/KWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | >100MW | |
Typical average output | 40% | |
Typical life | 25 years |