Category | Onshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1001-1830/Kwpeak | 1001–1830£(2010)/KWpeak |
Operating cost | £(2010)28-69/Kwpeak | 28–69£(2010)/KWpeak |
Year for which cost is valid | 2030 | 2030 |
Typical size | >5MW | |
Typical average output | 29% | |
Typical life | 20-25 years |