Category | Onshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1118-1822/Kwpeak | 1118–1822£(2010)/KWpeak |
Operating cost | £(2010)28-68/Kwpeak | 28–68£(2010)/KWpeak |
Year for which cost is valid | 2015 | 2015 |
Typical size | >5MW | |
Typical average output | 29% | |
Typical life | 20-25 years |