Category | Onshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1184-1820/Kwpeak | 1184–1820£(2010)/KWpeak |
Operating cost | £(2010)28-68/Kwpeak | 28–68£(2010)/KWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | >5MW | |
Typical average output | 29% | |
Typical life | 20-25 years |