Notes
Assuming output at 95% in order to do the conversion to MWh.
Category | Biomass conversion wet biomass and waste to gas | |
Source | AEA UK Supply Curve for Renewable Heat | |
Capital cost | £(2010)2m/2MW plus £(2010)750/kW plus £(2010)110/kW | 223£(2010)/MWh |
Operating cost | £(2010)93/kW | 11£(2010)/MWh |
Year for which cost is valid | 2010 | 2010 |
Typical size | 2MW | |
Typical average output | 95% |
Assuming output at 95% in order to do the conversion to MWh.