Notes
Residual capacity 595 PJ. VAROM is based on 0.17M$ / ton natural Uranium includes full disposal costs of 0.31M$ / ton natural U Contains all enrichment etc costs including electricity and assuming that 1 ton of natural uranium contains 0.7PJ and £1 = $1.8 Source: MIT (2003)