Renewable UK (2010) Chanelling the Energy: A way forward for the UK Wave & Tidal Industry Towards 2020[1]
Renewable UK (2010) Chanelling the Energy: A way forward for the UK Wave & Tidal Industry Towards 2020[1]
Technologies | Fuels | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Valid in year | Capital cost | Operating cost excluding fuel | Size | Output | Efficiency | Life | Fuel cost | Fuel limit | ||
Wave First Wave Farm | 2010 | £m(2010)42-82/10MWpeak | £m(2010)0.9-4.2/10MWpeak | 10 MW | 30-35% | 25 years |