Notes
What should be included in this category?
What should be excluded from this category?
How are these costs used in the 2050 Pathways model?
| Data point | Valid in | Cost | Limit | Source | |
|---|---|---|---|---|---|
| ? | ? | ||||
What should be included in this category?
What should be excluded from this category?
How are these costs used in the 2050 Pathways model?