- 2050 working assumption Hydroelectricity High/Low Range 2010-2050
- Markal 3.24 Hydroelectricity <1.25MW 2000
- MARKAL 3.26 Hydroelectricity Default - Hydro power - Large (>20 MW) 2010
- MARKAL 3.26 Hydroelectricity Default - Hydro power - Large (>20 MW) 2050
- MottMacDonald (2011) Hydroelectricity Run of the River Hydro 2010
- MottMacDonald (2011) Hydroelectricity Run of the River Hydro 2050
- MottMacDonald 2010 Hydroelectricity FOAK Hydro 100MW 2010
- MottMacDonald 2010 Hydroelectricity NOAK Hydro 100MW 2010